How to compare builder quotes like-for-like
Three quotes for the same extension can differ by tens of thousands of pounds, and the lowest headline price is often the one that has left the most out.
Why quotes are hard to compare
- Each builder prices their own idea of the job unless you give them the same list.
- Items are excluded ("EXCL"), left as "TBC", or priced as provisional sums that will change.
- Some include VAT, some don't, and some aren't VAT registered.
- Missing items come back later as variations, usually at a higher price.
Five steps to a fair comparison
- Send every builder the same schedule of works, based on your Architect's drawings and specification.
- Put each builder's price against each line. Mark anything excluded, TBC or missing.
- Add the missing items back at a budget rate, so every total covers the same work.
- Compare including VAT, since a builder who isn't VAT registered can be genuinely cheaper.
- Check the builder, not just the price: insurance, an insurance-backed guarantee, references and fair stage-payment terms.
A typical example
In our sample 25 m² extension, the quote with the lowest headline price (£59,170 ex-VAT) had left out nine items worth about £24,775 at budget rates. Once those were added back, it ranked second, and a quote £11,620 higher on the headline was the best like-for-like value.
Never pay ahead of the work
Agree stage payments tied to inspected milestones (foundations approved, walls to wall-plate, roof on, first fix, plaster) with a small retention held until the end of the defects period. Get every change priced and signed before the work is done.
Run your own numbers
Try the free calculator for your project, or get the full Homeowner Kit: feasibility, grants, schedule of works, 3-builder quote comparison, payments and variations, in Excel and Google Sheets.